Grouped Bar Comparison
Best use: supplier, region or product comparisons.
Data needed: two to six comparable series.
Lead: 2 working days. Band: £180 to £260 + VAT.
Use when a ranking needs to be read, not merely noticed.
Archive register · 24 stock specimens
Filter by what the page needs, not by software. Each specimen lists the use, data needed, normal lead time and price band so an editor can brief the right thing first time.
Minimum job value is £180 + VAT. Send briefs to hello@whatthechart.com.
Best use: supplier, region or product comparisons.
Data needed: two to six comparable series.
Lead: 2 working days. Band: £180 to £260 + VAT.
Use when a ranking needs to be read, not merely noticed.
Best use: prices, claims, installations and monthly demand.
Data needed: time series and source note.
Lead: 2 working days. Band: £180 to £260 + VAT.
Useful when the bumps matter more than the end number.
Best use: sector panels that need fair scales.
Data needed: matched categories across groups.
Lead: 3 to 5 working days. Band: £260 to £520 + VAT.
The honest option when one heroic chart would hide the story.
Best use: mix, spend split and survey answers.
Data needed: totals that genuinely add up.
Lead: 2 working days. Band: £180 to £260 + VAT.
Not used when tiny slices would become decorative crumbs.
Best use: compliance flow, plant handling, service steps.
Data needed: ordered stages and exceptions.
Lead: 4 to 6 working days. Band: £420 to £650 + VAT.
A good process diagram makes the exception visible early.
Best use: research features and buyer guides.
Data needed: source pack, quotes and page size.
Lead: 7 to 10 working days. Band: £850 to £1,450 + VAT.
Built as a magazine page first, not as a poster squeezed later.
Best use: factories, depots, dealer coverage and projects.
Data needed: places, postcodes or checked coordinates.
Lead: 4 working days. Band: £360 to £620 + VAT.
Kept deliberately general unless location precision is editorially required.
Best use: density by region, not exact pin location.
Data needed: regional totals and boundaries.
Lead: 5 working days. Band: £420 to £700 + VAT.
Only used where the geography will not mislead the comparison.
Best use: product pages and buyer comparisons.
Data needed: clean rows, units and footnotes.
Lead: 2 to 3 working days. Band: £180 to £360 + VAT.
Units are treated as design material, not afterthoughts.
Best use: ranked firms, product ratings and benchmark pages.
Data needed: scoring method and tie rules.
Lead: 4 to 6 working days. Band: £420 to £800 + VAT.
The method note is designed before the trophy row.
Best use: implementation, regulation and product launch dates.
Data needed: dates, labels and milestones.
Lead: 2 to 4 working days. Band: £240 to £520 + VAT.
Good for narrow columns when a full process diagram is too much.
Best use: project features and installation reports.
Data needed: stages, durations and dependencies.
Lead: 4 working days. Band: £360 to £620 + VAT.
It looks simple only after the overlaps have been argued into place.
Best use: machinery, packaging and technical equipment.
Data needed: labelled parts and approved image reference.
Lead: 4 to 6 working days. Band: £420 to £650 + VAT.
Callouts are written for readers who know the subject already.
Best use: standards, compliance and buying routes.
Data needed: rules and named source authority.
Lead: 5 to 7 working days. Band: £520 to £900 + VAT.
Never built from memory. Rules need a source or an editor sign-off.
Best use: feature openers and short survey pages.
Data needed: three checked figures and captions.
Lead: 2 working days. Band: £240 to £420 + VAT.
Fast, but still sourced. Large type makes weak numbers look weaker.
Best use: correlation stories and outliers.
Data needed: paired numeric values.
Lead: 3 to 5 working days. Band: £300 to £560 + VAT.
Only worth it when the reader understands both axes quickly.
Best use: simple composition when exact ranking is secondary.
Data needed: three to five parts of a whole.
Lead: 2 working days. Band: £180 to £260 + VAT.
Often replaced by bars if the slices are close together.
Best use: good, better, best comparisons without fake scores.
Data needed: attributes and clear editorial criteria.
Lead: 4 working days. Band: £360 to £620 + VAT.
Readers can smell invented weighting. We keep the method plain.
Best use: annual reader polls and salary pages.
Data needed: respondent count, questions and raw totals.
Lead: 6 to 10 working days. Band: £850 to £1,450 + VAT.
Percentages are checked against respondent counts before design starts.
Best use: installation steps and factory walkthroughs.
Data needed: ordered images or sketched stages.
Lead: 3 to 5 working days. Band: £320 to £580 + VAT.
A practical choice when the photography is useful but uneven.
Best use: cost movement and margin explanations.
Data needed: opening value, changes and closing value.
Lead: 3 working days. Band: £260 to £480 + VAT.
Helpful when finance copy needs a visual audit trail.
Best use: logistics flows and distribution stories.
Data needed: origin, destination, route notes and scale needs.
Lead: 4 to 6 working days. Band: £420 to £750 + VAT.
Not a navigation map. It explains the route a reader needs for the article.
Best use: events, training dates and regulatory deadlines.
Data needed: dates, categories and publication cut-off.
Lead: 2 to 3 working days. Band: £180 to £360 + VAT.
Small type is tested at print size before final artwork leaves.
Best use: six to ten charts across one magazine issue.
Data needed: flatplan, sheets and priority list.
Lead: planned around press date. Band: £1,200 to £2,400 + VAT.
Retainers for monthly titles start from £950 + VAT per month.
Magazine problems
Send the raw totals, number of respondents, question wording and whether multiple answers were allowed. Mara will flag totals that cannot be reconciled before artwork starts.
Use bars or scorecards for clear ranking. Avoid area charts unless the scale is genuinely spatial or proportional. If the chart needs a caveat, the caveat belongs on the page.
Rules need named source material. Medical, financial or legal claims graphics require an editor signing off the interpretation before final artwork.
Supply units, model names and the exact order you want readers to compare. Scanned tables can be handled but add at least one working day.
Footnotes and caveats
No form, no portal. Attach the sheet, the copy direction and the print size. New clients pay a 40% deposit before work starts; established publishers are invoiced on 14-day terms.
hello@whatthechart.com